I just built a new garage and in the process of running the power. My question how do you guys run power for 2 machines. I have to run 50 amp for welder and was thinking should I run two separate circuits one for welder and one for plasma cutter or just two plugs on same circuit or just one plug and keep changing back and forth. I don't even have a plasma cutter yet but do plan on getting a 220 volt that will cut at least 1/2. The run will be about 60 feet from panel box and plan on running 6-2 wire Thanks