+ Reply to Thread
Results 1 to 4 of 4

Thread: Esab aristo 320 trouble codes 8, 9 and 10

  1. #1
    Join Date
    Jul 2019
    Posts
    3
    Post Thanks / Like

    Esab aristo 320 trouble codes 8, 9 and 10

    I got these 3 codes, and i'm unable to get any welding current out of this machine, in any mode. I can remove these codes from memory but they pop up back after restart so i guess there is somekind of a problem in this machine. Does anyone here have ideas of what causes this thing and what do i need to replace or fix in this situation?

  2. #2
    Join Date
    Jun 2013
    Posts
    108
    Post Thanks / Like

    Re: Esab aristo 320 trouble codes 8, 9 and 10

    These are high/low voltage errors for the control box, wire feeder or power source depending on what is displayed. You will want to check your voltage. It's common to get a voltage / communication error if you have low voltage or a missing phase going into the machine. Trouble codes for the pendant are on page 64 of this manual
    https://www.westermans.com/downloads...-450%20(1).pdf

  3. #3
    Join Date
    Jul 2019
    Posts
    3
    Post Thanks / Like

    Re: Esab aristo 320 trouble codes 8, 9 and 10

    Ok, thank You. I have to check if all phases are ok inside of machine too, i know that they are on socket which i'm using. Also, voltage in grid should be ok.

  4. #4
    Join Date
    Jul 2019
    Posts
    3
    Post Thanks / Like

    Re: Esab aristo 320 trouble codes 8, 9 and 10

    Voltage after switch was 405-407 volts, it is pretty much what it should be in 400v grid. I also downloaded service manual with wiring shematics to take a better look with electric guy.
    Last edited by Wilmils; 08-02-2019 at 01:48 PM.

+ Reply to Thread

Quick Reply Quick Reply

Register Now

Please enter the name by which you would like to log-in and be known on this site.

Please enter a password for your user account. Note that passwords are case-sensitive.

Please enter a valid email address for yourself.

A) Welding/Fabrication Shop
B) Plant/Production Line
C) Infrastructure/Construction/Repair or Maintenance/Field Work
D) Distributor of Welding Supplies or Gases
E) College/School/University
F) Work Out of Home

A) Corporate Executive/Management
B) Operations Management
C) Engineering Management
D) Educator/Student
E) Retired
F) Hobbyist

Log-in

Posting Permissions

  • You may post new threads
  • You may post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Page generated in 1,713,265,295.80947 seconds with 19 queries