Thanks for starting this,, whenever that was,,,

I went to several welding supplies,, and I was shocked at the variation in pricing,,
I asked about 80 Cu Ft argon, and 80 Cu Ft 75-25 as I have those two tanks
I was quoted between $27 and $58 for each tank,, I did ask one place about filling my CO2 tank,, that was $25,,
I forgot to ask the other places about the CO2,,
I will enter data when I do get the tanks filled,,,