Results 1 to 2 of 2

Thread: improving shipping times

  1. #1
    Join Date
    Nov 2008
    Location
    south GA where its hot in summer and cold in winter
    Posts
    5,100
    Post Thanks / Like

    improving shipping times

    As some of you know California is a mess in many ways. The ports are backed way up, so some of our product arrival has been delayed for weeks. But things have improved already this week, and they are up to 50% output up from 25% just a few days earlier. So, if you are waiting on product, please bare with us. All brands are feeling the bite of this. Fortunately with Oakland starting to clear things up, we'll be the first to benefit.
    Esab Migmaster 250
    Lincoln SA 200
    Lincoln Ranger 8
    Smith Oxy Fuel setup
    Everlast PowerPlasma 80
    Everlast Power iMIG 160
    Everlast Power iMIG 205
    Everlast Power iMIG 140E
    Everlast PowerARC 300
    Everlast PowerARC 140ST
    Everlast PowerTIG 255EXT

  2. #2
    Join Date
    Mar 2018
    Location
    SO.TRENTON
    Posts
    4
    Post Thanks / Like

    Re: improving shipping times

    ROGER THAT...
    Just order the Power Acr 161-STH...3/21/21 ...
    3 to 4 wks. wait time.. good price no shipping charge......
    Going on 4+yrs. with the 250-EX and the 251-IST...NO welding problems here....
    Thanks Everlast......
    ZZDOGG
    Unknow Weldor...

  3. Likes lugweld liked this post

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Page generated in 1,627,080,497.37084 seconds with 14 queries