-
improving shipping times
As some of you know California is a mess in many ways. The ports are backed way up, so some of our product arrival has been delayed for weeks. But things have improved already this week, and they are up to 50% output up from 25% just a few days earlier. So, if you are waiting on product, please bare with us. All brands are feeling the bite of this. Fortunately with Oakland starting to clear things up, we'll be the first to benefit.
Esab Migmaster 250
Lincoln SA 200
Lincoln Ranger 8
Smith Oxy Fuel setup
Everlast PowerPlasma 80
Everlast Power iMIG 160
Everlast Power iMIG 205
Everlast Power iMIG 140E
Everlast PowerARC 300
Everlast PowerARC 140ST
Everlast PowerTIG 255EXT
-
-
Re: improving shipping times
ROGER THAT...
Just order the Power Acr 161-STH...3/21/21 ...
3 to 4 wks. wait time.. good price no shipping charge......
Going on 4+yrs. with the 250-EX and the 251-IST...NO welding problems here....
Thanks Everlast......
ZZDOGG
Unknow Weldor...
-
Post Thanks / Like - 1 Likes, 0 Dislikes