    We should work on a thread about bids, its the thing gives a lot of guys the most headache.

  2. #2
    Join Date
    Nov 2010
    Posts
    2,668
    Post Thanks / Like

    Re: Bidding thread

    I'll throw in that a lot of companies have a price ceiling above which they are required by their management to get multiple bids. If your price comes in below that ceiling, they'll give you the job automatically. If you're dealing with a company who would honestly rather use you than somebody else anyway, they'll break the job down into component parts and as long as you turn in appropriately small bids for each part, you'll end up with the whole job anyway.

    For example, you have a nationally-owned company who has a $5k price ceiling before requiring multiple bids. Their local branch wants a small demo and rebuild done which will total $11k and they want you to do it but they have to skirt company rules to make that happen. They'll break down the job into demolition, construction, and painting, and you'll bid each component at less than $5k and it all ends up working out in the end.

    A company who really likes and trusts you will eventually volunteer what their price ceiling is. But first you'll do a lot of jobs for them that prove you're not going to take advantage of them. The guys on the ground understand that price isn't the only thing that a job should be awarded on.

  3. Likes Lis2323 liked this post
  4. #3
    Join Date
    Nov 2010
    Posts
    2,668
    Post Thanks / Like

    Re: Bidding thread

    Also, you want to make allowances for Murphy's appearance, because he usually shows up more on quoted jobs than on jobs by the hour.

    For example, in my area the excavating guys always have a rock clause which basically says if they hit rock, the price is $x/hr to blast or hammer it out, and this amount is on top of the quoted price.

    Jobs that are bid out are usually more profitable than jobs done on the hour. The reason is that if you screw up your bid, you end up working for free at some point. So what everybody does is to pad their bids by some percentage, often 10% to 30% over what they reasonably think the job should take. This is different than a rock clause type of thing, because if you do the job in the amount of hours you originally thought, you just made 10-30% more on the hour for your time. The rock clause type of thing is there to save your butt in very limited situations.

    The point of this post is to show you a couple ways that people allow for Murphy's entrance onto the stage. Padding bids increase your profits *if you get the job*, they decrease uncertainty on the part of the customer, and they also decrease your likelihood of getting the job if your competitors pad them less than you did. Clauses like the rock clause keep your initial bid low, but decrease your potential profits because you don't get that money unless a specific situation occurs. They also introduce uncertainty into the customer's mind because they aren't a solid quote. Therefore, you should use them sparingly, like an insurance policy. Don't put clauses in for every little thing, only use them for unlikely things which would sink you if you didn't allow for them.

    Basically, try to act in good faith and think about your bid from the customer's point of view.

  5. Likes Lis2323 liked this post
  6. #4
    Join Date
    Jan 2004
    Location
    Brethren, Mi
    Posts
    8,965
    Post Thanks / Like

    Re: Bidding thread

    Good post. Yes I do some in smaller segments for the cap reason. I did a TM recently where the downtime after the repairs was a factor. I splain, if I contract it then there is incentive to save, if I am doing it TM I am looking for every flaw.

  7. #5
    Join Date
    Jun 2016
    Posts
    1,002
    Post Thanks / Like

    Re: Bidding thread

    Quote Originally Posted by Sberry View Post
    Good post. Yes I do some in smaller segments for the cap reason. I did a TM recently where the downtime after the repairs was a factor. I splain, if I contract it then there is incentive to save, if I am doing it TM I am looking for every flaw.

    thats cheating!!! LOL
    lincoln 125sp
    dayton 250 ac/dc
    miller 211 w/spool gun
    ahp 200 sx tig
    lotos ltp5000d
    kubota b3200 FEL BH
    of course duramax diesel

  8. #6
    Join Date
    Apr 2015
    Location
    Fredericksburg, VA
    Posts
    4,705
    Post Thanks / Like

    Re: Bidding thread

    This may be part of bidding, but may warrant it's own discussion.

    Shop rate. How do you determine it?

    On the Facebook plasma groups and Blacksmith groups it is common for someone to ask how much to charge for an item or service.

    The standard answer from many members is:
    (Hrs x shop rate) + materials + materials mark up, etc.

    What is not clear to many is how these other businesses or people came up with the actual shop rate they charge.

    The typical answer seems to be in the $100-125 an hour range.

    New members, hobbyists, Side gigs like myself may not have the overhead a full time stand alone business charges.

    Sent from my SM-G996U using Tapatalk
    Millermatic 252 MIG
    Miller Dynasty 200DX TIG
    Altas 12x36 Metal Lathe
    Bridgeport Milling Machine
    Arclight Dynamics 4x8 plasma table
    www.psacustomcreations.com

  9. #7
    Join Date
    Nov 2010
    Posts
    2,668
    Post Thanks / Like

    Re: Bidding thread

    Quote Originally Posted by psacustomcreations View Post
    This may be part of bidding, but may warrant it's own discussion.

    Shop rate. How do you determine it?

    On the Facebook plasma groups and Blacksmith groups it is common for someone to ask how much to charge for an item or service.

    The standard answer from many members is:
    (Hrs x shop rate) + materials + materials mark up, etc.

    What is not clear to many is how these other businesses or people came up with the actual shop rate they charge.

    The typical answer seems to be in the $100-125 an hour range.

    New members, hobbyists, Side gigs like myself may not have the overhead a full time stand alone business charges.

    Sent from my SM-G996U using Tapatalk
    I think you're right, great idea for a second thread that's easily found by title search in the future.

+ Reply to Thread

Quick Reply Quick Reply

Register Now

Please enter the name by which you would like to log-in and be known on this site.

Please enter a password for your user account. Note that passwords are case-sensitive.

Please enter a valid email address for yourself.

A) Welding/Fabrication Shop
B) Plant/Production Line
C) Infrastructure/Construction/Repair or Maintenance/Field Work
D) Distributor of Welding Supplies or Gases
E) College/School/University
F) Work Out of Home

A) Corporate Executive/Management
B) Operations Management
C) Engineering Management
D) Educator/Student
E) Retired
F) Hobbyist

Log-in

Posting Permissions

  • You may post new threads
  • You may post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Page generated in 1,713,310,744.21961 seconds with 19 queries